Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2020-11-08 05:24
519
union(Mr.)
Beijing
987 East Qinshuiting Rd., Jiangning District, Nanjing, China
http://www.susun-construction.com/ http://union.jinfengmesh.com/
These tie rods are used to connect formwork walers and strong backs to various formwork systems.
The forging head is specifically designed to fit the interior channels of your formwork system and bolt shaft is designed with the standard 15mm EURO thread.
http://www.susun-construction.com/