Language

Construction metal walk through scaffolding frames

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-17 17:17

  • Browse the number:

    112

Send an inquiries
Company Profile
Sino Sources Tech Co. Ltd
By certification [File Integrity]
Contact:

sino-sources(Mr.)  

Telephone:

Area:

Beijing

Address:

Economic Development Zone Shun Road, No. 7 in Jinghai County, Tianjin, Tianjin, China (301600)

Website:

http://sino-sources.jinfengmesh.com/

Product Details
Model Number: sino002-#9324 Brand Name: sino sources Key Specifications/Special Features: Construction metal walk through scaffolding frames MaterialQ235Surface
TreatmentPainting, Powdercoated, Electroplate Size WalkthroughFrame: (Width*Height)
1219*1700mm, 1219mm*1930mm, 1219mm*1524mm, 914mm*1700mm
LadderFrame style 1: (Width*Height)
1219mm*1700mm, 1219mm*1219mm, 1219mm*914mm, 1219mm*490mm,
762mm*1700mm
LadderFramestyle 2: (Width*Height)
914.4*939.8, 914.4mm*1244.6mm, 914.4mm*1549.4mm, 914.4mm*2006.6mm,
736.6mm*1524mm, 736.6mm*2006.6mm
ShoringFrame: (Width*Height)
609.6mm*914.4mm, 609.6mm*1219.2mm, 609.6mm*1524mm, 609.6mm*1828.8mm,
1219.2mm*914.4mm, 1219.2mm*1219.2mm, 1219.2mm*1524mm, 1219.2mm*1828.8mm
Andwecanproduceasyourrequest Color Galvanized silver, Red, Blue, Yelloworasyourrequest FullUnits 2pcsFrames, 2pcsofCrossBrace, 4pcsCouplingPinandPlanks with hooks
Shipping Information:
  • FOB Port: Tianjin
  • Lead Time: 20 - 30 days
Main Export Markets:
  • Asia
  • Central/South America
  • Mid East/Africa